Difference between revisions of "1900-S Boiler Problem - WR"

From VAMWorld
Jump to: navigation, search
(1900-S Boiler Problem)
(1900-S Boiler Problem)
 
(33 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
|+San Francisco Mint Equipment Problems
 
|+San Francisco Mint Equipment Problems
 
|-
 
|-
|'''Working conditions at the San Francisco Mint in 1900 stand in sharp contrast compared to today standards (2020). In 1900 at the San Francisco Mint there was no electrical lighting, most machinery had not been upgraded or replaced since 1874 and the machinery did not run off of electricity. In addition, at all three mints the boilers, ovens and furnaces were fueled by wood or coal. In March of 1900 the first gas fired Annealing furnace went online at the Philadelphia Mint. Shortly after the Annealing furnace went online gas was extended to the Melting, Tempering and furnaces for die department. The New Orleans Mint first gas plant was online by May 25, 1900. The new Philadelphia Mint building that opened in 1901 had the most modern equipment for that time period.'''  
+
|'''Working conditions at the San Francisco Mint in 1900 stand in sharp contrast compared to today standards (2020). In 1900 at the San Francisco Mint there was no electrical lighting, most machinery had not been upgraded or replaced since 1874 and the machinery did not run off of electricity. In addition, at all three mints the boilers, ovens and furnaces were fueled by wood or coal. In March of 1900 the first gas fired Annealing furnace went online at the Philadelphia Mint. Shortly after the Annealing furnace went online gas was extended to the Melting, Tempering and furnaces for the die department. The New Orleans Mint first gas plant was online by May 25, 1900. The first gas furnace approved for the San Francisco Mint was August 29, 1900. The new Philadelphia Mint building that opened in June of 1901 had the most modern equipment for that time period.'''  
 
|}
 
|}
<br />
 
 
{| class="wikitable" style="width: 99%; color:black; background-color:#eaf3ff;" cellpadding="10"
 
{| class="wikitable" style="width: 99%; color:black; background-color:#eaf3ff;" cellpadding="10"
 
|-
 
|-
 +
! align="center" |'''[[1900-S VAM-23]] '''
 +
(  Obverse & Reverse)
 +
!'''Construction Of The New Philadelphia Mint Building '''
 +
(Photos of the New Philadelphia Mint Building)
 +
|-
 +
! align="left" style="width: 45%|
 
<gallery mode="slideshow">
 
<gallery mode="slideshow">
 
1900-S_RonH_VAM-23_OBV_02262012.jpg|'''1900-S VAM-23 Obverse'''
 
1900-S_RonH_VAM-23_OBV_02262012.jpg|'''1900-S VAM-23 Obverse'''
 
1900-S_RonH_VAM-23_REV_02262012.jpg|'''1900-S VAM-23 Reverse'''
 
1900-S_RonH_VAM-23_REV_02262012.jpg|'''1900-S VAM-23 Reverse'''
1900_RonH_VAM-16_OBV_1a.jpg|'''1900-P VAM-16 Obverse'''
+
</gallery>
1900_RonH_VAM-16_REV_1a.jpg|'''1900-P VAM-16 Reverse'''
+
! align="right" style="width: 45%|
 +
<gallery mode="slideshow">
 +
Foundation of U.S. Mint Building New and Workers.png|Building the Foundation of the New Mint Building
 +
New U.S. Mint Building South View 12 31 1897.png|Construction Of The New Philadelphia Mint Building 12-31-1897
 +
New U.S. Mint Building 12 31 1897.png|Construction Of The New Philadelphia Mint Building 12-31-1897
 +
New U.S. Mint Building 7 5 1898.png|Construction Of The New Philadelphia Mint Building 7-5-1898
 +
New U.S. Mint Building North West View 7 5 1898.png|Construction Of The New Philadelphia Mint Building 7-5-1898
 +
New U.S. Mint Building 3 31 1899.png|Construction Of The New Philadelphia Mint Building 3-31-1899
 +
New U.S. Mint Building 9 30 1899.png|Construction Of The New Philadelphia Mint Building 9-30-1899
 +
New U.S. Mint Building Sw Corner 9 30 1899.png|Construction Of The New Philadelphia Mint Building 9-30-1899
 +
New U.S. Mint Building 12 30 1899.png|Construction Of The New Philadelphia Mint Building 12-30-1899
 +
New U.S. Mint Building 6 30 1900.png|Construction Of The New Philadelphia Mint Building 6-30-1900
 
</gallery>
 
</gallery>
 
|-
 
|-
! align="center" |'''[[1900-S VAM-23|1900-S VAM-23 Obverse/Reverse]] '''||'''[[1900-P VAM-16|1900-P VAM-16 Obverse/Reverse]] '''
+
! align="left" | '''San Francisco Mint Equipment Problems'''
|-
 
! align="left" | '''Branch Mint San Francisco Equipment Problems'''
 
 
! align="left" | '''Philadelphia Mint's New Building '''
 
! align="left" | '''Philadelphia Mint's New Building '''
 
|-
 
|-
|style=" text-align:left;" | ''' 1. [[:image:Mr Church Assignment for SF Mint - Page 519.png| Mr Church to visit Washington]]''' ||style=" text-align:left;"|''' 1. [[:image:Cost of new Mint building - Page 49.png|Cost of new Mint building .]]''' 
+
|style=" text-align:left;" | ''' 1. [[1900-S Appropriations for New SF Equipment - WR|Appropriations for New SF Equipment]]''' ||style=" text-align:left;"|''' 1. [[1900-S Philadelphia Mint's New Building - WR|Philadelphia Mint's New Building .]]'''
|-
 
|style=" text-align:left;" |''' 2. [[:image:Funds for New Equipment at SF Mint - Page 517.png|Funds for new equipment at SF Mint page 1.]]''' ||style=" text-align:left;"|''' 2. [[:image:New Mint Building - Page 200.png|New Mint Building .]]'''
 
|-
 
|style=" text-align:left;" |''' 3. [[:image:Funds for New Equipment at SF Mint - Page 518.png|Funds for new equipment at SF Mint page 2.]]''' ||style=" text-align:left;"|''' 3.  [[:image:New Mint Building DC - Page 215.png|Appropriations for new Machinery at Mint building.]]'''
 
|-
 
|style=" text-align:left;" |''' 4. [[:image:Mr Church Assignment for SF Mint - Page 520.png|Mr Church's assignment at Denver & SF Mints page 1.]]'''||style=" text-align:left;"|''' 4. [[:image:Mr Church to Appear in Washington - Page 548.png|Mr Church to Appear in Washington]]'''
 
|-
 
|style=" text-align:left;" |''' 5. [[:image:Mr Church Assignment for SF Mint - Page 521.png|Mr Church's assignment at Denver & SF Mints page 2.]]'''||style=" text-align:left;"|'''5. [[:image:New Gas Annealing Furnace - Page 505.png|New Gas Annealing Furnace for Philadelphia Mint.]]''' 
 
|-
 
|style=" text-align:left;" |''' 6. [[:image:MR Church Leaving for SF Mint.png|Mr. Church Leaving for San Francisco Mint.]] '''||style=" text-align:left;"|'''6. [[:image:New Gas Furnace For Silver Coinage - Page 506.png|New Gas Furnace For Silver Coinage Page 1.]]'''
 
|-
 
|style=" text-align:left;" |''' 7. [[:image:Request for SF Boiler Cost.png|Request for Cost to Fix San Francisco Boiler]] '''||style=" text-align:left;"|'''7. [[:image:New Gas Furnace For Silver Coinage - Page 507.png|New Gas Furnace For Silver Coinage Page 2.]]'''  
 
 
|-
 
|-
|style=" text-align:left;" |''' 8. [[:image:SF Boiler Replacement Cost.png|San Francisco Boiler Replacement Cost]] '''||style=" text-align:left;"|'''8. [[:image:New Gas Furnace New Mint July 2nd - Page 460.png|New Gas Furnace for New Mint]]'''  
+
|style=" text-align:left;" |''' 2. [[1900-S SF Equipment Inspection - WR|San Francisco Equipment Inspection]]''' ||style=" text-align:left;"|''' 2. [[1900-S New machinery for New Mint - WR|New machinery for New Philadelphia Mint]]'''  
 
|-
 
|-
|style=" text-align:left;" |''' 9. [[:image:SF Boiler Replacement cost Increase.png|San Francisco Boiler Replacement Cost Increase]] '''||style=" text-align:left;"|'''9. [[:image:Hamburg Germany Electrolytic - Page 407.png|Electrolytic Refinery Process page 1]]'''  
+
|style=" text-align:left;" |''' 3. [[1900-S San Francisco Boiler Replacement Cost - WR|San Francisco Boiler Replacement Cost]]''' ||style=" text-align:left;"|''' 3. [[1900-S Gas furnaces - WR|Gas furnaces]] '''
 
|-
 
|-
|style=" text-align:left;" |'''10. [[:image:1900-S Jan 4th Boiler Problem Page 1.jpg|San Francisco Boiler Problem Page 1.]] '''||style=" text-align:left;"|'''10. [[:image:Hamburg Germany Electrolytic - Page 408.png|Electrolytic Refinery Process page 2]]'''  
+
|style=" text-align:left;" |''' 4. [[1900-S San Francisco Boiler Problem - WR|San Francisco Boiler Problem]]'''||style=" text-align:left;"|''' 4. [[1900-S Electrolytic Refinery Process - WR|Electrolytic Refinery Process]]'''  
 
|-
 
|-
|style=" text-align:left;" |'''11. [[:image:1900-S Jan 4th Boiler Problem Page 2.jpg|San Francisco Boiler Problem Page 2.]] '''||style=" text-align:left;"|'''11. [[:image:Hamburg Germany Electrolytic - Page 409.png|Electrolytic Refinery Process page 3]]'''  
+
|style=" text-align:left;" |''' 5. [[1900-S New SF Gas Furnace - WR|New SF Mint Gas Furnace]]'''||style=" text-align:left;"|'''5. [[1900-S Mint Vaults and Storage of Morgan Dollars - WR| Mint Vaults and Storage of Morgan Dollars]] '''
 
|-
 
|-
|style=" text-align:left;" |'''12. '''||style=" text-align:left;"|'''12. [[:image:Contract for Electrolytic Refinery Process Approved - Page 438.png|Contract for Electrolytic Refinery Process Approved]]'''
 
 
|}
 
|}
  

Latest revision as of 06:36, 11 February 2020

1900-S Boiler Problem

San Francisco Mint Equipment Problems
Working conditions at the San Francisco Mint in 1900 stand in sharp contrast compared to today standards (2020). In 1900 at the San Francisco Mint there was no electrical lighting, most machinery had not been upgraded or replaced since 1874 and the machinery did not run off of electricity. In addition, at all three mints the boilers, ovens and furnaces were fueled by wood or coal. In March of 1900 the first gas fired Annealing furnace went online at the Philadelphia Mint. Shortly after the Annealing furnace went online gas was extended to the Melting, Tempering and furnaces for the die department. The New Orleans Mint first gas plant was online by May 25, 1900. The first gas furnace approved for the San Francisco Mint was August 29, 1900. The new Philadelphia Mint building that opened in June of 1901 had the most modern equipment for that time period.
1900-S VAM-23

( Obverse & Reverse)

Construction Of The New Philadelphia Mint Building

(Photos of the New Philadelphia Mint Building)

San Francisco Mint Equipment Problems Philadelphia Mint's New Building
1. Appropriations for New SF Equipment 1. Philadelphia Mint's New Building .
2. San Francisco Equipment Inspection 2. New machinery for New Philadelphia Mint
3. San Francisco Boiler Replacement Cost 3. Gas furnaces
4. San Francisco Boiler Problem 4. Electrolytic Refinery Process
5. New SF Mint Gas Furnace 5. Mint Vaults and Storage of Morgan Dollars


Back to 1900-S Die Study Material